Parabolica 60

Parabolica 60 Production - Nov 2025

This update is specifically for all Parabolica 60 international group buy customers. Information regarding other kits will be shared in our monthly reports.

Hello everyone,

Apologies for the delayed update. Our visit to Shenzhen coincided with all the case components being sent out for post-processing (anodizing, powder coating, etc.), so we weren't able to gather enough photos for a comprehensive report.

Here's the good news in one sentense: the actual ETA for the Parabolica 60 may be earlier than previously communicated. After a period of queuing for post-processing, the pace has accelerated significantly. Combined with our habit of pre-producing and pre-packing accessories, final delivery is now unlikely to extend into late December.

Below is the detailed progress for all components:

Case:

  • Top & Bottom Cases: Community colors have been confirmed. All top and bottom cases are currently undergoing mass anodizing. Some colors have already returned to the warehouse, passed QC, and been stored. See photos below.

  • Mid-frame: All copper and brass mid-frames are complete, have passed QC, and are stored. The coated black and pink versions are awaiting initial samples for confirmation, expected within the next week.

  • Plates: Anodized aluminum plates (matching case colors) are complete, have passed QC, and are stored. Carbon fiber and PP plates are currently in transit.

  • Badges: Production is ongoing (almost finish), with post-processing expected to begin next week.

  • PEI DLC: We notice this material is typically scheduled at the very end of production. It is not yet fully complete. However, since the quantity we prepared is small and it will not ship with the main batch, this will not affect the shipping timeline for any standard orders. We plan to open sales for the PEI DLC units alongside the extras after fulfilling all initial orders.

Accessories:

  • PCB: Production is complete. Units are currently undergoing firmware flashing and packaging.

  • Screws & Small PCBAs: 90% of the packaging for these components is complete.

  • Forcebreak Kit: Already stored and has passed assembly testing.

  • Tadpoles: A new batch has been molded and is currently in production. *Please see details below.

  • Case & Shipping Box: Pre-packing is underway and is expected to be completed ahead of schedule within a week.

  • Cards & Poster: Production is complete, and items are stored.

*Minor Revision for Production Batch:
During assembly testing, we found that the Tadpoles from the initial R1 mold were slightly smaller than the screw holes in the new case batch, which could cause minor internal movement. Consequently, we have re-molded and produced a new batch of D3.5 Tadpoles. To better accommodate this change, we have also switched the TOP mount screws to Phillips-head screws with smaller heads. This adjustment will not impact your user experience (typing feel, sound, etc.) and is solely for quality control purposes. It is provided completely free of charge.